Dragon Line - Turnkey - Design Supply Install and Commission - Control Room AC and Cooling Systems

Client: Dragon Line - Milford Haven

Budget: 180 K

Details: Dragon Line (Milford Haven) required AC and cooling for a number of control rooms all based within the gas generation site including Zone 2 systems at jetty location.

 

Description:

Dragon Line (Milford Haven) required AC and cooling for a number of control rooms all based within the gas generation site including Zone 2 systems, at jetty location.

Project scope from initial design concept through to site installation and commissioning.