BT Newcastle (Hadrian House) Close Control AC Systems

Client: BT Newcastle

Budget: 200K

Details: Computer room cooling for close control of temperature and humidity to meet high tolerance BT specifications.

 

Description:

Computer room cooling for close control of temperature and humidity to meet high tolerance BT specifications across a number of phases.

Including technical office air conditioning systems.

Project scope from initial design concept through to site installation and commissioning.

Go to top Back