Blackford Dolphin Column Stabilised Drilling Unit Control Room AC Systems
Air conditioning systems for oil rig platform.(Holland and South Africa) Bespoke Zone 2 air conditioning plant covering a number of key areas on the platform including PGM, drill switch rooms and rig personnel accommodation areas. Project scope from initial design concept through factory build to site installation and commissioning. Client : Dolphin Drilling Ltd Budget : 200K Details : Bespoke Zone 2 air conditioning plant covering a number of key areas on the platform including PGM, drill switch rooms and rig personnel accommodation areas