BT Newcastle (Hadrian House) Close Control AC Systems

Computer room cooling for close control of temperature and humidity to meet high tolerance BT specifications across a number of phases. Including technical office air conditioning systems. Project scope from initial design concept through to site installation and commissioning. Client: BT Newcastle Budget: 200K Details: Computer room cooling for close control of temperature and humidity to meet high tolerance BT specifications.
Go Back