Dragon Line (Milford Haven) required AC and cooling for a number of control rooms all based within the gas generation site including Zone 2 systems, at jetty location. Project scope from initial design concept through to site installation and commissioning. Client: Dragon Line – Milford Haven Budget: 180 K Details: Dragon Line (Milford Haven) required AC and cooling for a number of control rooms all based within the gas generation site including Zone 2 systems at jetty location.