Leeds University – Nexus Building

Full Design, supply, install and commission 13 off Mitsi Electric VRF systems, 12 off heat recovery and 1off heat pump systems serving 149 off ducted and cassette indoor units, complete with valved BC mode boxes with 43off spare connections for future expansion purposes.

Additionally 6off duty/ standby comms rooms split systems and 16off inverter driven AHU DX cooling/ heat pump systems were installed to provide the cooling and heating for the 8off AHU’s.

All systems linked back to an Acrol control network panel for full control purposes with external monitoring via the BMS.